G80 Canal and Relocation of Infrastructure

Anglo American – Kumba Iron Ore

Kathu, Northern Cape

May 2013 – September 2016

Scope of Services:  New dewatering pipeline (Design and Construction Monitoring) and New Stormwater channel culverts. 

Feasibility study, detail design and construction monitoring of total project.

Water pipes:  construction of 600mm diam (1.6 km long) and 350 mm diam (3.3 km long) above ground steel pipeline, complete with all fittings and specials.

Bulk earthworks design, haul roads, concrete silt traps, concrete canal access ramp.  Construction of earthworks.

Construction of reinforced concrete (“trapezoidal” channel – 4.5 km long). Construction of 3 No. reinforced concrete (cast-insitu) culverts and 1 No. reinforced concrete (precast culvert). 

Construction of 4.8km steel pipeline above ground.