Roggeveld Wind Farm

Concor (Nordex)

Sutherland, Northern Cape

2019-2020

    • BVi offered a full professional service which included: Preliminary and detailed geological investigations, wind turbine foundation design, internal road network geometric design, pavement design and site supervision during construction.  The Roggeveld wind energy facility has been designed to fit the local conditions with the technical details as follows:

      Turbine Model

      Nordex AW125/3150

      Turbine Capacity

      3,15MW

      Hub Height

      100m

      No. of Turbines

      47

      Foundation Diameter

      18,0m

      Total Road Length

      32 km